Junior River Racing Update 3/20/26

Harbor Freight Tools for schools foundation


This program was made possible through a grant with: https://hftforschools.org/


IVHS: Delivered the trailer so it can now be blasted and painted.

More photos and videos on Instagram.
https://www.instagram.com/d7_3riversracing/

66 days to Boatnik

🚣

66 days to Boatnik 🚣

 
 

Grants Pass High School

GPHS: Adding some finishing touched to the trailers before paint. Got setup with pulse MIG as well and are learning the new process.


Mount Shasta High School

Hayden Taylor Mount Shasta High School: Sides are on, working on completing inside welds before the hood gets attached!

North Valley High School

NVHS: Welding out the hull. Rogue Muffler is letting the students use their welder with pulse MIG. Pulse makes welding the thinner stuff much more attainable for beginners.


Hidden Valley High School

HVHS: Has the backbone of the boat completed. The bottom, stringers, and back transom are all in place. Next step is to put the sides on.


Mason Collins

Mason Collins (Fruitdale student): Printed some rigging parts to hold blower hoses.



Previous
Previous

Junior River Racing Update 3/27/26

Next
Next

Junior River Racing Update 3/13/26

Sitka Engineering · Grants Pass, Oregon

Built from Sitka aluminum mini jet boat kits

Every Junior River Racing hull starts as a CNC cut 5052 and 5086 marine aluminum kit from our shop in Oregon, from the 6ft Nano and 8ft Rowdy up to 20 ft river sleds.