Junior River Racing Update 4/3/26

IVHS: bottom and reverse chines attached.

More photos and videos on Instagram.
https://www.instagram.com/d7_3riversracing/

52 days to Boatnik

🚣

52 days to Boatnik 🚣

Harbor Freight Tools for schools foundation


This program was made possible through a grant with: https://hftforschools.org/

Grants Pass High School

GPHS: Boat is welded out and the rigging has started. Steering, blower, fitting etc installed.


Mount Shasta High School

Hayden Taylor Mount Shasta High School: getting the gas tank welded up

North Valley High School

NVHS: No update


Hidden Valley High School

HVHS: No update


Mason Collins

Mason Collins (Fruitdale student): prepping the motor for install



Previous
Previous

Junior River Racing Update 4/10/26

Next
Next

Junior River Racing Update 3/27/26

Sitka Engineering · Grants Pass, Oregon

Built from Sitka aluminum mini jet boat kits

Every Junior River Racing hull starts as a CNC cut 5052 and 5086 marine aluminum kit from our shop in Oregon, from the 6ft Nano and 8ft Rowdy up to 20 ft river sleds.